Quilter's Project Planner

Everything You Need to Dream, Plan & Organize 12 Projects!

Published by Stash Books
Distributed by Simon & Schuster

See More Retailers

About The Book

Plan a year of quilting projects

This delightful planner is designed especially for quilters so that you can track multiple projects throughout the year—because let’s face it, who doesn’t have lots of projects going at once?! Set your project goals, track your progress, and manage your time and works-in-progress (WIPs). Each project has four pages to track and record all the critical details: construction notes, pattern info, block layout, due dates and tasks, your supply list, and more. Plus, flip to the back of the planner for a quilting reference section and even more handy tools.
  • Get inspired to start AND finish your projects with project sheets, tracking logs, and beautiful quilt photos
  • Keep track of classes, gifts, items on loan, contact info, retreat packing lists, and so much more
  • Spiral-bound and tabbed for ease of use

About The Authors

Betsy LaHonta has been crafting, sewing and creating for as long as she can remember. She loves to figure out ways to get the project ideas out of her head and into the world. Betsy lives in Northern California with her family.

Kerry Graham is a graphic designer and illustrator. During the day, as part of her job to develop new products, she gets to draw, sew, and surf the web for inspiration. When she's not at work, she makes Girl Scout projects with her daughter, Alivia; dances hip-hop with her older son, Hudson; and cooks with her younger son, Trenton. Kerry lives in the San Francisco Bay Area of Northern California.

Product Details

  • Publisher: Stash Books (July 25, 2020)
  • Length: 96 pages
  • ISBN13: 9781617459009

Browse Related Books

Resources and Downloads

High Resolution Images

More books from this author: Betsy LaHonta

BACK TO TOP